Virar-alibaug Multimodal Corridor Route Map !free! Page

Virar-alibaug Multimodal Corridor Route Map !free! Page

The Virar-Alibaug Multimodal Corridor (VAMMC) is a flagship 126-km infrastructure project designed to revolutionize connectivity in the Mumbai Metropolitan Region (MMR). Executed by the Maharashtra State Road Development Corporation (MSRDC), this project aims to connect the northern suburbs of Mumbai (Virar) with the southern coastal town of Alibaug, reducing travel time by 50%. MagicBricks

Here is a comprehensive overview of the route, map, and key project details as of early 2026. 🗺️ Route Map & Key Connectivity

The corridor acts as a "half ring road" connecting major suburban growth centers and key transportation arteries, passing through Palghar, Thane, and Raigad districts. Starting Point: Navghar (near Virar) on NH-48 (Mumbai-Ahmedabad Highway). Key Intersections: Bhiwandi Bypass: Connects to NH-3 (Mumbai-Nashik Highway). Kalyan/Dombivli: Passes through key residential and industrial hubs. Intersects the Mumbai-Pune Expressway and JNPT Port Road. Atal Setu (MTHL): Connects to the Mumbai Trans Harbour Link. Ending Point: Balavali near Alibaug (Raigad district). MagicBricks 🛠️ Project Phases & Construction

The 126-km project is divided into two main phases to streamline construction: Phase 1 (Navghar to Balavali):

Approx. 96.4 km to 98.5 km stretch (primary construction phase). Phase 2 (Balavali to Alibaug): Remaining 29.9 km stretch. 💡 Key Technical Features 8 to 14-lane access-controlled expressway. Multimodal Nature: Includes a dedicated center path for Metro Line 14. Design Speed: Right of Way (RoW): 99 meters wide, accommodating service roads and utilities. MagicBricks ⏱️ Timeline & Status (2026 Updates)

Land acquisition is in advanced stages, with MSRDC aiming to acquire 70% of land by mid-2026.

Fresh tenders on a Build-Operate-Transfer (BOT) basis are expected to be floated by MSRDC by March/April 2026. Completion: The project is expected to be completed by 2030. 🚀 Benefits Traffic Decongestion:

Diverts heavy traffic from JNPT away from Mumbai city center. Travel Time:

Reduces travel time between Virar and Alibaug from over 4 hours to roughly 90–120 minutes. Economic Growth: virar-alibaug multimodal corridor route map

Boosts logistics and residential development in growth centers like Virar, Bhiwandi, Kalyan, Dombivli, Panvel, Taloja, and Uran.

For the exact, detailed alignment map, you can refer to the official MMRDA project gallery

Virar-Alibaug Multimodal Corridor (VAMC) is a 126 km-long planned project in the Mumbai Metropolitan Region (MMR) that aims to reduce travel time between Virar and Alibaug from four hours to approximately two. Route & Major Connectivity The corridor starts at ) on the Mumbai-Ahmedabad Highway (NH-48) and terminates at ) in Raigad

. It serves as a vital ring road connecting the outskirts of Mumbai. marathon.in

Virar-Alibaug Multimodal Corridor (VAMC) is a 126 km long, 14-lane greenfield expressway designed to connect the Palghar, Thane, and Raigad districts within the Mumbai Metropolitan Region (MMR). Spearheaded by the Maharashtra State Road Development Corporation (MSRDC), it aims to cut travel time between Virar and Alibaug from four hours to roughly 75 minutes. Route Alignment and Key Connections

The corridor starts at Navghar (near Virar) on the Mumbai-Ahmedabad Highway (NH-48) and terminates at Chowk/Balavali (near Alibaug). It is strategically designed to link several major transport hubs and highways:

Virar Alibaug Corridor: Road Map | Status | Village List | Latest News

The Virar-Alibaug Multimodal Corridor (VAMC) is an ambitious 126-km infrastructure project designed to revolutionize connectivity within the Mumbai Metropolitan Region (MMR). Spanning three districts—Palghar, Thane, and Raigad—this 8- to 14-lane access-controlled expressway is expected to reduce travel time between Virar and Alibaug by roughly 50%. Route Map and Alignment Details The Virar-Alibaug Multimodal Corridor (VAMMC) is a flagship

The corridor's route is strategically designed to bypass the congested urban core of Mumbai, connecting major growth centers and national highways.

Northern Terminus: Navghar on the Mumbai-Ahmedabad Highway (NH-8) in Palghar district.

Southern Terminus: Balavali in Raigad district, near Alibaug.

Key Connectivity Hubs: The route passes through several critical areas including Bhiwandi, Kalyan, Dombivli, Panvel, Taloja, and Uran.

Highway Intersections: It will link several major national highways, including NH-3 (Agra-Delhi), NH-4 (Pune-Bangalore), NH-4B, and NH-17, as well as the Mumbai-Pune Expressway.

Infrastructure Synergy: The map specifically aligns with key projects like the Navi Mumbai International Airport (NMIA), the Jawaharlal Nehru Port Trust (JNPT), and the Mumbai Trans Harbour Link (MTHL). Phased Construction

The Maharashtra State Road Development Corporation (MSRDC) is overseeing the project in two distinct phases:

All You Need to Know About Virar Alibaug Multimodal Corridor Intended benefits

The Virar-Alibaug Multimodal Corridor (VAMC) is an ambitious 126-km infrastructure project designed to redefine the transportation landscape of the Mumbai Metropolitan Region (MMR). Spearheaded by the Maharashtra State Road Development Corporation (MSRDC), this 8- to 14-lane access-controlled expressway will serve as a crucial "Middle Ring" for the region, bypassing heavily congested city routes. Comprehensive Route Map Overview

The corridor spans across three major districts: Palghar, Thane, and Raigad. It starts at Navghar near Virar in the north and terminates in Alibaug in the south. The route is strategically planned in two distinct phases:

Phase 1 (Navghar to Balavali): Approximately 96.41 km long, this segment connects the Mumbai-Ahmedabad Highway (NH-48) to Balavali in Raigad.

Phase 2 (Balavali to Alibaug): A 29.9 km extension that completes the link to the coastal town of Alibaug. Key Connectivity Nodes & Interchanges

The VAMC is specifically designed to integrate with several existing and upcoming mega-projects, creating a seamless multi-modal network:

Virar Alibaug Multimodal Corridor: Route & Status (2026) ​


Intended benefits

  • Radically shorter travel times between northern MMR (Virar) and coastal Raigad (Alibaug), bypassing central Mumbai.
  • Shift of long-distance travel from private cars to high-capacity mass transit and ferries.
  • Support for decentralised housing and employment along the corridor.
  • Freight diversion to reduce heavy-vehicle intrusion in suburban and urban cores.
  • Stimulus for tourism and regional economic integration.

Segment 4: Thane to Navi Mumbai

  • Kalwa – Passing east of Kalwa.
  • Mumbra – Elevated section over Mumbra bypass.
  • Parsik Tunnel (proposed) – Through Parsik Hill.
  • Belapur – Connects to Sion–Panvel Highway & Nerul.

1. Corridor Overview

  • Total Length: ~126 km
  • Type: Multimodal (road + rail + utility corridor)
  • Lanes: 6–8 lane access-controlled expressway
  • Status: Proposed / Under planning (DPR completed by MSRDC)
  • Key Benefit: Decongests Mumbai, connects northern to southern Maharashtra coastline.

Part 1: What is the VAMC? A Corridor of Three Phases

Before diving into the turns and towns, it is essential to understand that the VAMC is being developed in three distinct phases. The route map varies slightly based on which phase you are examining, as the corridor aims to ring around the dense heart of Mumbai.

  • Phase 1 (Virar to Vasai): The northern spur.
  • Phase 2 (Vasai to Palghar): Extending the western arm.
  • Phase 3 (Palghar to Alibaug): The longest segment, swinging east and then south.

The route map effectively draws a massive western and southern arc around the existing Mumbai Suburban district.


Learn how to download files in Laravel step-by-step: from public paths to protected disks, S3 storage, and streaming downloads. Includes real-world examples, security best practices, and functional PHP code.


Únete a la comunidad de desarrolladores que han decidido dejar de picar código y empezar a construir productos reales. Recibe mis mejores trucos de arquitectura cada semana:

I agree to receive announcements of interest about this Blog.

Andrés Cruz

ES En español